24 Января 2025 | пятница | 20:32
Energoterra

Новости

Elizavetovskoye Field Start Up

Апреля 24, 2012

JKX Oil & Gas plc is pleased to announce that test production from well M-53 has commenced in its Elizavetovskoye licence in Poltava, Ukraine.

E.ON Russia started equipment delivery to construction site of Power unit 3 at Berezovskaya GRES

Апреля 24, 2012

Generator stator has been delivered to construction site of Power unit 3 at Berezovskaya GRES (Krasnoyarsk Territory, Sharypovo district).

FAS approves Bashneft’s stock swap

Апреля 23, 2012

The Federal Antimonopoly Service (FAS) of the Russian Federation has approved the application of JSOC Bashneft for legal merger of the Company’s subsidiaries, OJSC Ufimsky refinery plant, OJSC Novoil, OJSC Ufaneftekhim, OJSC Bashkirnefteprodukt and OJSC Orenburgnefteprodukt, with the Company.

In QI, E.ON Russia Increased Power Sales by 12%

Апреля 23, 2012

E.ON Russia's wholesale market power sales in QI 2012 made 18,364 billion kWh, which is by 12% more than in QI 2011 (16,335 billion kWh).

IDGC of the North-West having commenced formation of forecasts concerning variations of load and electric energy consumption in 2014-2018

Апреля 23, 2012

The work is arranged in accordance with the requirements of the Company standard “Forecasting variations of load and electric energy consumption within the territory of a constituent entity of the Russian Federation serviced by IDGC of the North-West, JSC”.

TATNEFT Introduces Efficient Crude Oil Recovery Methods

Апреля 19, 2012

The technology of limiting water flow into the producing wells of OAO TATNEFT by the use of synthetic resin based compositions (KFS Technology) is applied in terrigenous and carbonate reservoirs producing wells characterized by the presence of an oil-water zone.

Bashneft continues improving its financial results

Апреля 19, 2012

Today Bashneft Group, including JSOC Bashneft and its subsidiaries and affiliates, has published its audited consolidated financial results prepared in accordance with International Financial Reporting Standards (IFRS) for the 4th quarter and the year ended 31 December 2011.

Nord Stream Completes Laying Line 2 Ahead of Schedule

Апреля 18, 2012

The Nord Stream Project took another major step forward today with the completion of offshore pipelay of the second of its twin 1,224-kilometre gas pipelines through the Baltic Sea ahead of schedule.

Unrivalled simulator was commissioned at Surgutskaya GRES-2

Апреля 18, 2012

At Surgutskaya GRES-2 a unique computer simulator was put into operation. This simulator has no parallels in power industry of the Russian Federation.

TNK-BP to Invest ca. 2.5 Bln Rubles to Develop Yuzhno-Petyogskoe Field in Tyumen in 2012

Апреля 18, 2012

TNK-BP informs that LLC “TNK-Uvat” (a member of the TNK-BP Group) is commencing development of Yuzhno-Petyogskoe field in the southern Tyumen Region and plans to commission the field before the end of 2013.

1 . . . 574 575 576 577 578 579 580 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine