24 Января 2025 | пятница | 06:30
|
НовостиGazprom Neft increases hydrocarbon reserves by almost 9% in 2011Февраля 28, 2012As at 31 December 2011, the total "proven" and "probable" (2P) reserves of Gazprom Neft group under PRMS international standards amounted to 11.577 billion barrels of oil and 15.720 trillion cubic feet of gas, which translates into 14.197 billion barrels of oil equivalent. In 2012–2015, the Bashneft’s investments in the rebranding of its filling stations are expected to amount to 3.7 billion rublesФевраля 28, 2012At the meeting held on February 27, the Board of Directors of JSOC Bashneft discussed the progress of the action plan for monitoring the Company’s key material flows. Izhorskiye Zavody produces unbolt device for the main reactor joint for Novovoronezh NPP-2Февраля 28, 2012Izhorskiye Zavody, part of OMZ Group, has successfully completed tests of the unbolt device for the main reactor joint for Novovoronezh NPP-2. Statoil operated high impact gas discovery off TanzaniaФевраля 26, 2012Statoil and partner ExxonMobil have made a large gas discovery offshore Tanzania in the first exploration well in Block 2. At Kurakhovskaya TPP is included in grid the turbineФевраля 25, 2012Steam Turbine of «Turboatom» in block No 8 of Kurakhovskaya TPP (Ukraine) is included in grid. TNK-BP Increased the Pumping Equipment Turnaround Interval in 2011 up to a Record 615 DaysФевраля 24, 2012TNK-BP increased the turnaround interval of its pumping equipment up to a record 615 days and attained the international standards. Gazprom Neft selects contractor to build an oil gathering andtreatment station at the Badra oil field in IraqФевраля 24, 2012Gazprom Neft, the development operator of the Badra oil field in Iraq, has chosen a contractor to build the central oil gathering & treatment station following a tender. South Stream to be designed for maximum annual throughput of 63 billion cubic metersФевраля 23, 2012Alexey Miller, Chairman of the Gazprom Management Committee reported today to Russian President Dmitry Medvedev on the progress with the South Stream project. Izhorskiye Zavody launches check assemble of reactor with internals for Bolgarian Belene NPPФевраля 22, 2012Izhorskiye Zavody, part of OMZ Group, launched check assemble of the reactor vessel VVER-1000 for the first energy unit at Belene NPP (Bulgaria). Belorusneft: Prospects for Cooperation with Myanmar's Oil IndustryФевраля 21, 2012Association Belorusneft considers the possibility of establishing a joint venture for seismic surveys and service work in cooperation with one of the companies in Myanmar. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |