24 Января 2025 | пятница | 03:42
|
НовостиTNK-BP to invest $170 mln in New Technologies in Orenburg Region by 2016Февраля 14, 2012According to Francis Sommer, TNK-BP Senior Vice President, Operations and Technology, Orenburgneft plans to expand its new technology programme this year and deploy 40 innovative technolgies. Power Machines manufacture equipment for a CCPP in KolpinoФевраля 14, 2012Kaluga Turbine Works (KTZ OJSC) company, member of Power Machines Group, has manufactured and successfully tested power generating equipment for a new power unit being built in Kolpino district of Saint Petersburg. COTES to design upgrading of 500 kV outdoor switchgear for Ekibastuzskaya GRES-1Февраля 14, 2012A backbone switching substation within the unified electric power system of Kazakhstan - 500 kV outdoor switchgear for the Ekibastuzskaya GRES-1 will be upgraded within the framework of national grid modification program of the Republic of Kazakhstan. SIBUR and Gazprom Agree a Long-term Supply Contract for NGLФевраля 14, 2012SIBUR Holding and Gazprom have signed a long-term contract to supply natural gas liquids (NGL) from the Surgut Condensate Stabilisation Plant to the Tobolsk-Neftekhim facility up to 2021. SIBUR APG Processing up 3.3% in 2011, Petrochemical Production up 6.7%Февраля 13, 2012In 2011, SIBUR’s gas processing plants received more than 18 bln cubic metres of associated petroleum gas (APG) for processing, a 3,3% increase on 2010 (17.5 bln cubic metres). Production of dry stripped gas totalled 15.8 bln cubic metres, 2.9% ahead of 2010. CPC Shareholders Discussed the Expansion Project Progress StatusФевраля 13, 2012A meeting of the managing bodies of Caspian Pipeline Consortium was held on February 8 in Moscow. The meeting Agenda was dedicated to the matters related to the Expansion Project implementation. Power Machines continue to take part in upgrading Smolenskaya NPPФевраля 13, 2012Power Machines OJSC and Smolenskaya Nuclear Power Plant, which is a branch of Rosenergoatom Group OJSC, have signed a contract to upgrade turbogenerator excitation systems at the second power unit of Smolenskaya NPP. Completed manufacture of equipment for updating of TPP ZuevskayaФевраля 12, 2012OJSC "Turboatom" produced a low-pressure rotor - the last equipment for the turbine K-300-240 block № 4 of Zuevskaya TPP (Ukraine). The rotor was balanced and approved by the customer. Equipment is ready for shipment. Gazprom Neft reports: Net income, increased by 71% Y-o-Y to US$ 5,347 millionФевраля 10, 2012JSC Gazprom Neft has published its unaudited consolidated financial results in accordance with accounting principles generally accepted in the United States of America (US GAAP) for the year ended 31 December 2011. Rosneft holds public hearings on seismic research programmes on two Kara Sea blocksФевраля 09, 2012Public hearings were held in the city of Archangelsk to discuss seismic research programmes in the Kara Sea on two blocks licensed to Rosneft – East Prinovozemelsky-1 and East Prinovozemelsky-2 – which the Company is developing jointly with US oil and gas major ExxonMobil. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |