23 Января 2025 | четверг | 23:59
Energoterra

Новости

Baltic NPP: a routine meeting of Unit 1 construction control panel held on site

Февраля 03, 2012

А routine meeting of Unit 1 of Baltic NPP (Neman District of Kaliningrad Region) construction control panel was held on plant site.

“Zarubezhneft” and “ALROSA” signed an Agreement of intent for joint development of three gas fields

Февраля 03, 2012

OJSC “Zarubezhneft” and OJSC “ALROSA” signed an Agreement of intent stipulating the joint development of three gas and gas-condensate fields in the north-western part of Purovsky district, Yamalo-Nenets Autonomous District: Beregovoy, Ust-Yamsoveysky and Urengoysky.

TGC-1 increased its electricity output by 4.4% in 2011

Февраля 03, 2012

The electricity output by generating enterprises of the Company including Murmanskaya CHPP in 2011 amounted to 28,362.1 million kW/h, which is a 4.4% increase compared to 2010.

Delegation of OJSC "Turboatom" visited Slovakia

Февраля 03, 2012

Representatives of the plant conducted a series of talks with the Slovak power companies, visited HPP Gabcikovo and Zhilina, and made a presentation of the company.

Rosneft and Sberbank reach agreement in principle on Taas-Yuryakh project

Февраля 03, 2012

Rosneft and Sberbank signed a tentative agreement on the acquisition by Rosneft of a 35.3 percent stake in Taas-Yuryakh Neftegazodobycha.

INTER RAO UES launches electricity exports to Ukraine

Февраля 03, 2012

INTER RAO UES has signed a contract with Vostokenergo to deliver Russian electric power to Ukraine starting February 1, 2012. Essential conditions of the contract were fixed for one month.

Russian Joint Venture of State Corporation Rosatom and Alstom Will Supply the Turbine Island to the Baltic NPP

Февраля 02, 2012

Russian-French Joint Venture Alstom-Atomenergomash (AAEM) signed a contract on supply of turbine island equipment for units 1 and 2 of Baltic Nuclear Power Plant in the Kaliningrad region, which are to be commissioned in 2016 and 2018 respectively.

In 2011 Perm Engine Company produced 48 gas turbine plants, 32 of which were manufactured for OJSC “Gasprom”

Февраля 02, 2012

In 2011 Perm Engine Company produced and shipped 48 gas turbine plants, including 13 GTU intended for power generation application, and 35 for gas compressor units. 48 gas turbine plants were repaired.

Gazprom International take part in a ceremony to mark the beginning of drilling of the second borehole in Bolivia’s Ipati block

Февраля 02, 2012

Drilling in Ipati involves the use of a DLS 134 rig, with a power of 3000 HP. According to plans, the initial phase will involve the use of 914.4 mm-diameter drill bits, and the completion stage will take place at depths of approximately 6450 m-152.4 mm.

LUKOIL cranks up renewable energy capacities

Февраля 02, 2012

LUKERG Renew and Raiffeisen Energy & Environment signed an agreement on the acquisition of a 100-percent stake in a wind farm near Dobrich, Bulgaria.

1 . . . 587 588 589 590 591 592 593 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine