24 Января 2025 | пятница | 00:06
|
НовостиFRUNZE Started Shipping of Goods for CSЯнваря 29, 2012PJSC «Sumy Frunze NPO» started shipping of turbo-compressor trains (GPA) designed to equip the «Novomikunskaia» compressor station (CS) which is currently being constructed by Russian oil and gas Company «Gazprom» on a new branch of gas pipeline «Ukhta -Torzhok». Gazprom allocates record amount of investments for Russian regions gasification in 2012Января 29, 2012As part of the Program, this year Gazprom is allocating for Russian regions gasification a record amount of investments – RUB 37.660 billion versus RUB 29.070 billion in 2011. Thus, the amount of financing for Russian regions gasification has been increased by nearly 30 per cent. LUKOIL-BUNKER’s total bunker supply volume in 2011 grows by 23% up to 1.65 million tonsЯнваря 29, 2012LUKOIL-BUNKER’s total bunker supply volume in 2011 grew almost by 23% up to 1.65 million tons as compared with 2010 results. SPD Set a New Coring RecordЯнваря 28, 2012In January 2012, Salym Petroleum Development (SPD) set a new coring record in Salym oil fields. NPO delivers GPA to CS «Novourdomskaia»Января 28, 2012PJSC «Sumy Frunze NPO» is finishing the shipment of turbo-compressor units for the compressor station «Novourdomskaia», which is built on a new gas pipeline «Ukhta - Torzhok» (Russia). HMS Group to produce block modular equipment for SurgutneftegazЯнваря 28, 2012HMS Neftemash, a subsidiary of HMS Group, concluded an agreement with Surgutneftegaz for production and delivery of a large run of automated group measure units Mera Massomer and water distribution units for the number of Surgutneftegaz subsidiaries. Gazprom and Sovcomflot to arrange test LNG shipment via Northern Sea Route soonЯнваря 28, 2012The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Sergey Frank, Director General of Sovcomflot. TGC-1 has set new equipment at Putkinskaya HPP in KareliaЯнваря 28, 2012GC-1 has finished the large project of refurbishment three units' speed control at Putkinskaya HPP (Kem' HPPs Cascade) in Karelia. EMAlliance and Technopromexport Rehabilitate Power Capacities of IraqЯнваря 27, 2012EMAlliance and Technopromexport have signed a Contract for Supply of Boiler Supporting Steel Structure Parts for Power Unit No.3, Hartha TPP in Iraq, with capacity of 200 MW, whose reconstruction is carried out by Technopromexport. TNK-BP Develops Own Methodology for Monitoring and Evaluating Potential Overseas VenturesЯнваря 27, 2012TNK-BP has devised its own system for monitoring and evaluating potential overseas ventures to enhance the efficiency and minimize the risks and decision making of the Company’s expansion beyond its core markets. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |