24 Января 2025 | пятница | 00:06
Energoterra

Новости

FRUNZE Started Shipping of Goods for CS

Января 29, 2012

PJSC «Sumy Frunze NPO» started shipping of turbo-compressor trains (GPA) designed to equip the «Novomikunskaia» compressor station (CS) which is currently being constructed by Russian oil and gas Company «Gazprom» on a new branch of gas pipeline «Ukhta -Torzhok».

Gazprom allocates record amount of investments for Russian regions gasification in 2012

Января 29, 2012

As part of the Program, this year Gazprom is allocating for Russian regions gasification a record amount of investments – RUB 37.660 billion versus RUB 29.070 billion in 2011. Thus, the amount of financing for Russian regions gasification has been increased by nearly 30 per cent.

LUKOIL-BUNKER’s total bunker supply volume in 2011 grows by 23% up to 1.65 million tons

Января 29, 2012

LUKOIL-BUNKER’s total bunker supply volume in 2011 grew almost by 23% up to 1.65 million tons as compared with 2010 results.

SPD Set a New Coring Record

Января 28, 2012

In January 2012, Salym Petroleum Development (SPD) set a new coring record in Salym oil fields.

NPO delivers GPA to CS «Novourdomskaia»

Января 28, 2012

PJSC «Sumy Frunze NPO» is finishing the shipment of turbo-compressor units for the compressor station «Novourdomskaia», which is built on a new gas pipeline «Ukhta - Torzhok» (Russia).

HMS Group to produce block modular equipment for Surgutneftegaz

Января 28, 2012

HMS Neftemash, a subsidiary of HMS Group, concluded an agreement with Surgutneftegaz for production and delivery of a large run of automated group measure units Mera Massomer and water distribution units for the number of Surgutneftegaz subsidiaries.

Gazprom and Sovcomflot to arrange test LNG shipment via Northern Sea Route soon

Января 28, 2012

The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Sergey Frank, Director General of Sovcomflot.

TGC-1 has set new equipment at Putkinskaya HPP in Karelia

Января 28, 2012

GC-1 has finished the large project of refurbishment three units' speed control at Putkinskaya HPP (Kem' HPPs Cascade) in Karelia.

EMAlliance and Technopromexport Rehabilitate Power Capacities of Iraq

Января 27, 2012

EMAlliance and Technopromexport have signed a Contract for Supply of Boiler Supporting Steel Structure Parts for Power Unit No.3, Hartha TPP in Iraq, with capacity of 200 MW, whose reconstruction is carried out by Technopromexport.

TNK-BP Develops Own Methodology for Monitoring and Evaluating Potential Overseas Ventures

Января 27, 2012

TNK-BP has devised its own system for monitoring and evaluating potential overseas ventures to enhance the efficiency and minimize the risks and decision making of the Company’s expansion beyond its core markets.

1 . . . 589 590 591 592 593 594 595 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine