21 Января 2025 | вторник | 10:33
|
Новости"Turboatom" modernized high-precision machineМая 22, 2011On April 11, tool workshop (No 64) "Turboatom" after upgrading was introduced to the work of the universal milling machine "Mikron WFS3 DCM/M11". Nord Stream Pipeline Moves Another Step Closer to CompletionМая 18, 2011Two of the three sections of the 1,224 kilometre gas pipeline to be joined together off the coast of Finland. Third section to be joined up off the coast of Gotland, Sweden, in the summer. First pipeline to become operational before the end of 2011. LUKOIL STARTS MANUFACTURING EURO-5 MOTOR GASOLINEМая 18, 2011The Nizhny Novgorod Refinery (ООО LUKOIL-Nizhegorodnefteorgsintez), part of LUKOIL Group, has started manufacturing Euro-5 motor gasoline.It became possible due to the commissioning of a hydrofluoric alkylation unit as part of the catalytic cracking complex. "Turboatom" present to the customer and shipped equipment to the Rostov NPP (Russia)Мая 18, 2011In April 2011 the specialists of "Turboatom" handed over to representatives of the customer's transition connector for modular condenser turbine K-1100-60/1500-2m block № 3 of the Rostov NPP in the amount of 4,6 million UAH. Effective Technologies of Oil Fields OperationМая 18, 2011TATNEFT is actively introducing innovative technologies to ensure the efficient operation of oil fields. Their application has allowed the Company to increase the mean time before failure (MTBF) of the wells by 1.8 times for the past 10 years. This is one of the highest rates among the major oil companies in Russia. Gazprom Neft completes seismic survey in IraqМая 18, 2011Gazprom Neft announces that on the 4th of May it completed a 3-D field seismic survey at the Badra deposit in Iraq. The Iraqi Oil Exploration Company (OEC), who Gazprom Neft contracted in November 2010, carried out the seismic survey. Federal Grid Company Publishes RAS Q1 2011 ResultsМая 17, 2011Federal Grid Company of Unified Energy System (ticker MICEX, LSE: FEES) today released its financial results for 1Q 2011 in accordance with Russian Accounting Standards. Linear part of Gryazovets – Vyborg gas pipeline ready for startupМая 17, 2011Today in Saint Petersburg Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee held a meeting dedicated to engineering and construction of the Ukhta – Torzhok, Pochinki – Gryazovets, Gryazovets – Vyborg, SRTO – Torzhok gas pipelines and main compressor stations in Northwestern Russia as well as expansion of the Gryazovets gas hub. Offshore and Shore Sections of the Dzhubga – Lazarevskoe – Sochi gas pipeline were connectedМая 17, 2011LLC “STROYGAZMONTAZH”, general contractor of OJSC “Gazprom”, completed connection of the offshore and shore sections of the Dzhubga – Lazarevskoe – Sochi gas pipeline. Pipe laying vessel Bigfoot 1 performed midline tie-in (welding together two sections of the pipeline) near Kudepsta settlement. Representatives of the SSM Sweden Supervisory Body have visited Kola NPPМая 17, 2011The working visit of the specialists of SSM Swedish Agency for Radiation Safety was over. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |