26 Ноября 2024 | вторник | 06:34
|
Новости"Turboatom" dispatched clusters of turbine updating for Leningradskaya NPPАвгуста 05, 2010In particular were dispatched ten diaphragms (four diaphragms of the fifth stage and six – of the fourth stage) and eight stages of blades (four stages of blades of the fourth stage and four – of the fifth). Figures Demonstrating Results of Our Operations in July and from the Beginning of 2010Августа 05, 2010Oil companies of the Republic of Tatarstan produced 2,765,885 tons of crude oil in July with seven months production amounting to 18,842,576 tons or 100% with regard to the same period of the last year. Novovoronezh NPP: the plan for seven months of 2010 has been fulfilled by 100.4%Августа 05, 2010For the seven months of 2010 Novovoronezh NPP power units have generated 8283.1 mln kWh of electric power. The plan approved by the Federal Tariff Service (FTS) of Russia haы been fulfilled by 100.4%. Kaluganefteprodukt fuel sales target for 2010 is 354,000 tonsАвгуста 05, 2010TNK-BP’s Executive Director German Khan has held a meeting with staff at Kaluganefteprodukt during a trip to the Kaluga Region. Aleksandr Kurkin, Leader of the PU Centre, Andrey Shults, General Director of Kaluganefteprodukt, and other managers from the retail subsidiary also took part in the meeting. Balakovo NPP: power unit No. 3 is under scheduled repairАвгуста 05, 2010On August 1, 2010 power unit No. 3 of Balakovo NPP was shut down for scheduled midlife repair pursuant to the year schedule of scheduled preventive maintenance. Gazprom’s delegation had visited the Portovaya CS near Vyborg (Leningrad Oblast)Августа 05, 2010In Saint Petersburg Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee held a meeting dedicated to the gas transmission facilities development in Northern and Northwestern Russia. Rostov NPP: electric power generation plan for July has been fulfilled by 102.2%Августа 05, 2010Power unit No. 1 of Rostov NPP has fulfilled the electric power generation plan for July by 102.2%. The planned value is 734 mln kWh of electric power, the actual value – 750.4 mln kWh. 100,000 Pipes Concrete Weight Coated for the Nord Stream PipelineАвгуста 04, 2010One hundred thousand of the pipes needed for the Nord Stream Pipeline have now been concrete weight coated. In total about 202,000 concrete weight coated steel pipes will be needed for the two strings of the 1,224 kilometres natural gas pipeline through the Baltic Sea. SOCAR Georgia Petroleum opened 3 more petrol stations in GeorgiaАвгуста 04, 2010SOCAR Georgia Petroleum LLC (Daughter Company of SOCAR in Georgia) expands its petrol station network operating under “SOCAR” brand. BP Takes Action to Fast-Track Claims for Gulf Coast BusinessesАвгуста 04, 2010BP said today it has instituted a series of actions to expedite claim payments to businesses impacted by the oil spill in the Gulf of Mexico, including establishing an Immediate Action Claims Team. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |