26 Ноября 2024 | вторник | 07:01
Energoterra

Новости

Omsk airport unreasonably prevented independent delivery of fuel by «S7 Airlines» for its aircrafts

Августа 06, 2010

«The airport unreasonably evaded a contract with «S7 Airlines» OJSC for storage of aviation fuel in Omsk airport, which infringed the interests of the air carrier», said the Head of the FAS Russia's Department for Control over Transport and Communications, Dmitry Routenberg.

“Mashinostroitelnyi Zavod” OJSC visited by delegation from the Republic of South Africa

Августа 06, 2010

“Mashinostroitelnyi Zavod” OJSC (Mechanical Engineering Works) was visited by delegation from the Republic of South Africa. The purpose of the visit was to study the process of nuclear fuel production within the framework of technical seminar on the Russian nuclear technologies.

Bilibino NPP: over 10.6 mln kWh of electric power were generated in July, 2010

Августа 06, 2010

In July, 2010 Bilibino NPP power units generated 10.668 mln kWh of electric power. The plant ratio in July was 30%. The target figure for electric power production in August is 10.600 mln kWh. There were no violations of safe operation limits and conditions in July.

IDGC of North-West is introducing 76,83 MVA of transformer capacity and 239,19 km of PTL

Августа 06, 2010

The expected fulfillment of the investment program of IDGC of North-West for the 1st half year of 2010 will amount to RUR 748,3 mln or 101% from the planned indicators.

Smolensk NPP: plan for power generation in July has been fulfilled by 130.5%

Августа 06, 2010

In July Smolensk NPP power units generated 1.702 bln kWh of electric power that exceed the target figure by 398 mln kWh. Upon the whole since the beginning of 2010 electric power generation has amounted to 13.165 bln kWh.

BP Claim Payments Exceed $300 Million

Августа 06, 2010

BP said today that it has paid $303 million in claim payments to more than 40,000 individuals and businesses impacted by the oil spill in the Gulf of Mexico.

Forest fires have no impact on safe operation of Russian NPPs power units

Августа 06, 2010

Forest fires in some regions of the central part of our country developing because of extremely hot weather do not affect safe operation of Russian NPPs power units.

Since the year beginning over 74 ths. appeals from consumers are received by CSCs of IDGC of North-West

Августа 06, 2010

The volume of services rendered has amounted to RUR 38,8 mln. Over 7,9 ths appeals are applications for technological connection.

Kalinin NPP: over 1.5 bln kWh of electric power were generated in July

Августа 06, 2010

In July, 2010 Kalinin NPP power units generated 1.591 bln kWh of electric power. 1.494 bln kWh of electric power were transmitted to the energy system. The plant ratio in July was 71.29%.

BP Authorized to Begin Cementing Procedure on MC252 Well

Августа 05, 2010

BP has received authorization from the National Incident Commander (NIC) to conduct cementing operations on the MC252 well as part of the static kill procedure. Pumping operations are expected to begin Thursday, August 5th.

1 . . . 811 812 813 814 815 816 817 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine