29 Марта 2024 | пятница | 16:07
Energoterra

Новости

Testing of New Drill Pipes in TATNEFT

Апреля 29, 2010

At present Tatneft is testing TK-34P drill pipes with an inner polymer coating with high strength properties manufactured by Tuboscope Vetco.

IDGC of the North-West transfers a mobile 110/10/6 kilovolt substation from Vologda to Arkhangelsk

Апреля 29, 2010

It’s one of the decisions of the problem of capacity deficit in the central part of Arkhangelsk.

The Ministry of Defense Selected TNK-BP to Supply Jet Fuel under the First-ever Electronic Tender

Апреля 29, 2010

The contract was concluded after the first-ever electronic tender conducted by the Ministry of Defense. The total volume of supplies under this contract will amount to 235,000 tons from May to October 2010.

Daily production rate of well South Kishma-1 amounts to about 80 tons of light water-free oil

Апреля 29, 2010

The governmental delegation headed by Sufyan Al Alao, Minister of Petroleum and Mineral Resources of Syria, visited South Kishma oil field, which commercial operation is carried out by the Joint Venture established on a parity basis by two companies:

LUKOIL extracts Russia’s first Caspian oil

Апреля 28, 2010

First oil was extracted today at the Yu. Korchagin field in the Russian offshore of the Caspian Sea. Vladimir Putin, Chairman of the Government of the Russian Federation, participated in the ceremony dedicated to the commissioning of this field.

Most Powerful Excavator in Suek-Kuzbass Commissioned at Zarechny Strip Mine

Апреля 28, 2010

Zarechny strip mine affiliated to OAO SUEK-Kuzbass put s into operation the 26 cubic meter bucket excavator P&H2300XPC made by P&H Mining Equipment (USA).

“Vologdaenergo” will spend about RUR 7 million for reconstruction of 10 kilovolt OL “Kraskovo”

Апреля 28, 2010

Till the end of September in the framework of reconstruction over 100 concrete poles the operation life of which exceeds 35 years are planned to be installed instead of wood poles.

Borodinsky Strip Mine Reaches 900 Mln Tonne Milestone

Апреля 28, 2010

The privilege to ship the milestone tonne was granted to the crew of ERP-2500 No 4, the Mine's most productive rotary bucket excavator which made the most significant contribution to the collection of labor achievements of the enterprise:

Cooperation Agreement 2010 was signed between Gazprom Neft and the Administration of the Omsk Region

Апреля 28, 2010

The document was signed by Gazprom Neft Chairman of the Management Board Alexander Dyukov and the Governor of the Omsk Region Leonid Polezhaev.

SOCAR officials met with representatives of Tamoil Company

Апреля 28, 2010

SOCAR president Mr. Rovnag Abdullayev received the delegation visiting the country led by Executive Director of Libyan Tamoil Group Mr. Isam Zanati.

1 . . . 865 866 867 868 869 870 871 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine