19 Февраля 2025 | среда | 02:31
|
![]() |
Новости![]() Russian gas exports to Austria grow by 76.2 per cent in January 2016Февраля 04, 2016The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Reinhold Mitterlehner, Austrian Vice Chancellor. ![]() Unit 4 of the Beloyarsk NPP in the Sverdlovsk district of Russia has reached 50% capacityФевраля 03, 2016Unit 4 of the Beloyarsk nuclear power plant in the Sverdlovsk district of Russia has reached 50% capacity, the plant's operators announced on 28 January. ![]() Rosneft and PDVSA cooperate in implementation of 5 joint upstream projects in VenezuelaФевраля 02, 2016Rosneft Chaiman of the Management Board Igor Sechin held a working meeting with the Minister of Petroleum and Mining of the Bolivarian Republic of Venezuela, President of PDVSA, Eulogio Del Pino. ![]() Transneft Siberia has commissioned new telemechanics and automation systemsФевраля 02, 2016Technical upgrading was conducted at Isetskoe-1 oil pump station of Tyumen Oil Trunk Pipeline Department, Kholmogory OPS of Noyabrsk OTPD and Abatsakaya OPS of Ishim OTPD. ![]() Rosneft and GE Develop Joint Manufacturing in RussiaФевраля 02, 2016Rosneft and General Electric signed a long-term cooperation program. The document involves construction plan of joint ventures for production of marine, oil and gas, and electrical equipment to ensure timely construction and commissioning of production facilities. ![]() Enel Russia Releases 2015 Operating ResultsФевраля 01, 2016Net power output from Enel Russia’s power plants in 2015 totalled 42,090 GWh, roughly in line (-0.7%) with the 42,376 GWh posted in 2014. Output from CCGT units increased mainly because Sredneuralskaya CCGT had been under recovery during the first quarter of 2014. ![]() Kazancompressormash manufactures compressor systems for TatneftЯнваря 29, 2016Kazancompressormash (HMS Group) has manufactured and delivered compressor systems for Tatneftegazpererabotka (Tatneft). ![]() ROSATOM presented leading nuclear technologies at The Nuclear Industry Summit Latin America 2016Января 28, 2016On January 26-27 in Buenos Aires (Argentina) held the Nuclear Industry Summit Latin America 2016. ![]() JSC TGC- completed implementation of the technological information exchange system in the Murmansk OblastЯнваря 28, 2016Technological information system for exchange with the automated system operator system was commissioned at the TGC-1’s Borisoglebskaya HPP. ![]() Eesti Energia: asset impairment tests completedЯнваря 27, 2016Eesti Energia’s management board has finalised impairment tests of property, plant and equipment, and intangible assets as of December 31, 2015. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |