27 Ноября 2024 | среда | 14:48
|
НовостиRussian gas exports to Austria grow by 76.2 per cent in January 2016Февраля 04, 2016The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Reinhold Mitterlehner, Austrian Vice Chancellor. Unit 4 of the Beloyarsk NPP in the Sverdlovsk district of Russia has reached 50% capacityФевраля 03, 2016Unit 4 of the Beloyarsk nuclear power plant in the Sverdlovsk district of Russia has reached 50% capacity, the plant's operators announced on 28 January. Rosneft and PDVSA cooperate in implementation of 5 joint upstream projects in VenezuelaФевраля 02, 2016Rosneft Chaiman of the Management Board Igor Sechin held a working meeting with the Minister of Petroleum and Mining of the Bolivarian Republic of Venezuela, President of PDVSA, Eulogio Del Pino. Transneft Siberia has commissioned new telemechanics and automation systemsФевраля 02, 2016Technical upgrading was conducted at Isetskoe-1 oil pump station of Tyumen Oil Trunk Pipeline Department, Kholmogory OPS of Noyabrsk OTPD and Abatsakaya OPS of Ishim OTPD. Rosneft and GE Develop Joint Manufacturing in RussiaФевраля 02, 2016Rosneft and General Electric signed a long-term cooperation program. The document involves construction plan of joint ventures for production of marine, oil and gas, and electrical equipment to ensure timely construction and commissioning of production facilities. Enel Russia Releases 2015 Operating ResultsФевраля 01, 2016Net power output from Enel Russia’s power plants in 2015 totalled 42,090 GWh, roughly in line (-0.7%) with the 42,376 GWh posted in 2014. Output from CCGT units increased mainly because Sredneuralskaya CCGT had been under recovery during the first quarter of 2014. Kazancompressormash manufactures compressor systems for TatneftЯнваря 29, 2016Kazancompressormash (HMS Group) has manufactured and delivered compressor systems for Tatneftegazpererabotka (Tatneft). ROSATOM presented leading nuclear technologies at The Nuclear Industry Summit Latin America 2016Января 28, 2016On January 26-27 in Buenos Aires (Argentina) held the Nuclear Industry Summit Latin America 2016. JSC TGC- completed implementation of the technological information exchange system in the Murmansk OblastЯнваря 28, 2016Technological information system for exchange with the automated system operator system was commissioned at the TGC-1’s Borisoglebskaya HPP. Eesti Energia: asset impairment tests completedЯнваря 27, 2016Eesti Energia’s management board has finalised impairment tests of property, plant and equipment, and intangible assets as of December 31, 2015. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |