27 Ноября 2024 | среда | 11:50
Energoterra

Новости

Gazprom taking comprehensive cost optimization measures

Февраля 19, 2016

The Gazprom Board of Directors took notice of the information about the cost optimization (reduction) trends across Gazprom Group in 2016.

Transneft Druzhba Finalized Revamping of Kuybyshev - Unecha - 2 Oil Pipeline Section

Февраля 19, 2016

Transneft Druzhba, JSC finalized revamping of the linear portion of Kuybyshev ‑ Unecha ‑ 2 oil trunk pipeline (Druzhba– 2), the crossing over M6 Caspian highway.

Turboatom has completed manufacture of equipment for Unit Slavyansk TPP

Февраля 18, 2016

The turbine is completely made and transferred for shipment. Final stage of work on the contract was the control assembly of High Pressure Cylinder, Medium Pressure Cylinder and Low Pressure Cylinder with rotors of turbine K-330-23.5.

Naftogaz refused to register Gazprom’s balancing gas as purchased by Ukraine

Февраля 18, 2016

Naftogaz of Ukraine proposed to apply standard European balancing practices to the transmission of Russian gas across Ukraine, as the balancing issue is not regulated by the contract between Naftogaz and Gazprom.

Slavneft increased C1 oil reserves by 26.3 million tons in 2015, reserves replenishment made 170%

Февраля 18, 2016

In 2015, OAO NGK Slavneft ensured the increment of recoverable C1 oil reserves in the volume of 26.3 million tons, including 24.2 million tons in KhMAO-Yugra and 2.1 million tons in the Krasnoyarsk region.

High pressure pumps of HMS Group are put into operation on Yarudeyskoye field

Февраля 18, 2016

Ten high pressure pumps supplied by HYDROMASHSRVICE (HMS Group) for the project of Yargeo (NOVATEK) have been put into operation at the oil and gas condensate pumping stations on the Yarudeyskoye field.

Rosneft Reviewed the Results of DeGolyer & MacNaughton's Independent Audit of its Hydrocarbon Reserves

Февраля 17, 2016

According to the results of the audit performed by DeGolyer & MacNaughton under the SEC (United States Securities and Exchange Commission) life-of-field classification, as of December 31, 2015, Rosneft proven hydrocarbon reserves stood at 34,465 mmboe (4,654 mmtoe).

In 2015 StroyGazMontazh has invested over 4.3 billion rubles in the development of its assets

Февраля 17, 2016

In 2015, SGM Group of companies, which is controlled by Arkady Rotenberg, has invested over 4.3 billion rubles in the development of its assets.

LUKOIL puts on stream gas processing unit in Budennovsk

Февраля 17, 2016

Deputy Prime Minister of the Russian Federation Arkady Dvorkovich, President of PJSC LUKOIL Vagit Alekperov and Stavropol Region Governor Vladimir Vladimirov took part in the official startup of the first phase of the gas processing unit at the Stavrolen plant in Budennovsk.

StroyGazMontazh completed alteration and modification of Pisarevka compressor station

Февраля 16, 2016

SGM Group has completed alteration and modification of Pisarevka compressor station located in Voronezh Region. The station is located within Petrovsk – Pisarevka section of Urengoy - Novopskov cross-country gas pipeline.

1 . . . 140 141 142 143 144 145 146 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine