27 Ноября 2024 | среда | 11:50
|
НовостиGazprom taking comprehensive cost optimization measuresФевраля 19, 2016The Gazprom Board of Directors took notice of the information about the cost optimization (reduction) trends across Gazprom Group in 2016. Transneft Druzhba Finalized Revamping of Kuybyshev - Unecha - 2 Oil Pipeline SectionФевраля 19, 2016Transneft Druzhba, JSC finalized revamping of the linear portion of Kuybyshev ‑ Unecha ‑ 2 oil trunk pipeline (Druzhba– 2), the crossing over M6 Caspian highway. Turboatom has completed manufacture of equipment for Unit Slavyansk TPPФевраля 18, 2016The turbine is completely made and transferred for shipment. Final stage of work on the contract was the control assembly of High Pressure Cylinder, Medium Pressure Cylinder and Low Pressure Cylinder with rotors of turbine K-330-23.5. Naftogaz refused to register Gazprom’s balancing gas as purchased by UkraineФевраля 18, 2016Naftogaz of Ukraine proposed to apply standard European balancing practices to the transmission of Russian gas across Ukraine, as the balancing issue is not regulated by the contract between Naftogaz and Gazprom. Slavneft increased C1 oil reserves by 26.3 million tons in 2015, reserves replenishment made 170%Февраля 18, 2016In 2015, OAO NGK Slavneft ensured the increment of recoverable C1 oil reserves in the volume of 26.3 million tons, including 24.2 million tons in KhMAO-Yugra and 2.1 million tons in the Krasnoyarsk region. High pressure pumps of HMS Group are put into operation on Yarudeyskoye fieldФевраля 18, 2016Ten high pressure pumps supplied by HYDROMASHSRVICE (HMS Group) for the project of Yargeo (NOVATEK) have been put into operation at the oil and gas condensate pumping stations on the Yarudeyskoye field. Rosneft Reviewed the Results of DeGolyer & MacNaughton's Independent Audit of its Hydrocarbon ReservesФевраля 17, 2016According to the results of the audit performed by DeGolyer & MacNaughton under the SEC (United States Securities and Exchange Commission) life-of-field classification, as of December 31, 2015, Rosneft proven hydrocarbon reserves stood at 34,465 mmboe (4,654 mmtoe). In 2015 StroyGazMontazh has invested over 4.3 billion rubles in the development of its assetsФевраля 17, 2016In 2015, SGM Group of companies, which is controlled by Arkady Rotenberg, has invested over 4.3 billion rubles in the development of its assets. LUKOIL puts on stream gas processing unit in BudennovskФевраля 17, 2016Deputy Prime Minister of the Russian Federation Arkady Dvorkovich, President of PJSC LUKOIL Vagit Alekperov and Stavropol Region Governor Vladimir Vladimirov took part in the official startup of the first phase of the gas processing unit at the Stavrolen plant in Budennovsk. StroyGazMontazh completed alteration and modification of Pisarevka compressor stationФевраля 16, 2016SGM Group has completed alteration and modification of Pisarevka compressor station located in Voronezh Region. The station is located within Petrovsk – Pisarevka section of Urengoy - Novopskov cross-country gas pipeline. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |