27 Ноября 2024 | среда | 13:40
|
НовостиThe 4000th Tanker Loaded at the CPC Marine TerminalФевраля 11, 2016The 4000th tanker, since the start of loading operations in 2001, was loaded at the CPC Marine Terminal. Just to recall, CPC finished 2015 with a fresh oil lifting record of about 43 million tons. In 2015 the Enel Group generated a total of 284 TWh of electricityФевраля 11, 2016In 2015 the Enel Group generated a total of 284.0 TWh of electricity (283.1 TWh in 2014), distributed 417.4 TWh on its networks (411.1 TWh in 2014) and sold 260.1 TWh (261.0 TWh in 2014). Specialists of Transneft Diascan have carried out a successful gas pipeline inspection in IranФевраля 11, 2016The devices were injected in Assalouyeh and were received at Sirri Island. During the inspection sea water was the pumped product. The length of the inspected section was about 290 km. Turboatom finished manufacture of condenser for South-Ukrainian NPPФевраля 10, 2016PJSC "Turboatom" completely manufactured condenser for Unit No 2 South-Ukrainian NPP. Enterprise has completed manufacture of three casings of capacitor row A. The control assemblage casings were presented to customer. First Russian-produced hydro-treatment catalyst successfully tested at Gazprom Neft Omsk RefineryФевраля 10, 2016The hydro-treatment catalyst will now be used at the Omsk Refinery in the hydro-treatment of Euro-5 winter diesel fuels, and will lead to further improvements in the quality of goods produced. PMC ESPO Progresses with Construction of a Dedicated Power Line Crossing over the Angara RiverФевраля 09, 2016PMC ESPO, LLC (a subsidiary of Transneft, JSC) progresses with construction of a dedicated 110 kV overhead transmission line (OTL) crossing over the Angara river (Boguchany district of Krasnoyarsk region). Gazprom holds Investor Day in New York and LondonФевраля 08, 2016Gazprom held the eleventh annual Investor Day in New York and London. Traditionally, the events received wide attention from the investment community. NOVATEK Repays EurobondsФевраля 05, 2016NOVATEK announced today the Company has repaid the USD 600 million Eurobond issue according to the bonds maturity schedule. The bonds were originally issued in February 2011 for a five-year term with a stated coupon rate of 5.326%. Hydromashservice to manufacture pumping units for Moscow RefineryФевраля 05, 2016Hydromashservice (HMS Group) has signed a contract for supply of a large batch of the state-of-the-art pumping units for the Moscow Refinery (Gazpromneft Moscow Refinery). Turboatom signed Contract with IndiaФевраля 04, 2016Turboatom (Ukraine) and TRAFALGAR (India) signed contract for supply of equipment. Under contract, enterprise will supply spare parts for power equipment of operating four turbines with capacity 240 MW at nuclear power plants Rajasthan (RAPP) and Kaiga in India. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |