28 Ноября 2024 | четверг | 03:23
|
НовостиGazprom and Kuwait Petroleum Corporation sign Memorandum of UnderstandingНоября 13, 2015Alexey Miller, Chairman of the Gazprom Management Committee and Nizar Al-Adsani, Chief Executive Officer and Deputy Chairman of the Board of Directors of Kuwait Petroleum Corporation signed a Memorandum of Understanding in Sochi. Rosneft Representatives take part in the SPIMEX Conference Commodity Exchange Market Russia – 2015Ноября 13, 2015Rosneft believes that the exchange provides an important infrastructure platform enabling commodity market operations and a clear and transparent mechanism of fair pricing for key commodities produced in the Russian Federation. A third turbine modernized by "Turboatom" was commissioned at Novosibirsk HPPНоября 13, 2015A Kaplan turbine (station No. 5) at Novosibirsk HPP (Russia) was commissioned with the participation of a group of experts of commissioning and installation supervision of PJSC "Turboatom" in November 2015. This is the third of the seven turbines, modernized by the enterprise. Transneft Upper Volga conducts preparation to constructing Shilovo-3 PEPS in Ryazan RegionНоября 13, 2015Construction will be performed as part of implementation of investment project on increase of amounts of aviation kerosene transportation to Moscow Region from 1.5 to 2.5 million tons a year. Rosgeologia has drilled 8 wells for Orenburgneft joint-stock company in 2015Ноября 13, 2015Votemiro Company (a subsidiary of Rosgeologia, the Orenburg Region) has completed 8 water wells in the Orenburg Region. Well drilling was carried out under the contract with Orenburgneft signed in February 2015. E.ON Russia Publishes the Indicators According to the IFRS for 9 Months of 2015Ноября 12, 2015E.ON Russia publishes the unaudited 9 months 2015 financial results prepared in accordance with International financial reporting standards. Russia plans to load experimental fuel assemblies with REMIX-fuel in the reactor core of unit 3 of the Balakovo NPPНоября 12, 2015Russia plans to load experimental fuel assemblies with REMIX-fuel in the reactor core of unit 3 of the Balakovo nuclear power plant in June 2016. Svyaztransneft has finished technical re-equipment of communication network on Yaroslavl – Moscow oil trunk pipelineНоября 12, 2015Priokskoye and Verkhnevolzhskoe Industrial Communication Departments have finished works on technical re-equipment of communication networks of control and monitoring stations of Yaroslavl – Moscow oil trunk pipeline (section from Security Station communications center to Yaroslavl communications center). Transneft Upper Volga implements measures on increase of diesel fuel export as part of Sever ProjectНоября 12, 2015Transneft Upper Volga, JSC continues works on increase of diesel fuel supplies for export through Baltic Pipeline System (BPS) towards Oil Port Primorsk as part of Sever Investment Project. E.ON confirms full-year outlook and timetable for transformationНоября 12, 2015E.ON’s planned transformation is on schedule. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |