28 Ноября 2024 | четверг | 23:04
|
НовостиOMZ Group and OAO UK Kuzbassrazrezugol have entered an agreement on long-term cooperationДекабря 03, 2010OMZ Group and OAO UK Kuzbassrazrezugol, the largest Russian coal producer, have signed a long-term agreement program for 2010-2015. TATNEFT Presented Its Energy Saving Technologies at the Specialized ExhibitionДекабря 03, 2010The exposition of OAO TATNEFT at the XII-th International specialized exhibition "Energy. Resource Saving-2010" organized by the "Kazan Fair" Exhibition Centre from November 30 to December 3, was one of the most representative. TATNEFT Intensifies Processing of Associated Petroleum GasДекабря 03, 2010Tatneftegazpererabotka Administration of OAO TATNEFT collected 640.1 million cubic meters of petroleum gas for 10 months of 2010 with 575,500,000 cubic meters out of this amount directed for processing. Stroytransgaz to Continue Participation in the Development of the Russian UESДекабря 03, 2010Stroytransgaz continues to expand its activities in the field of electrical supply network construction. Stroytransgaz took part in the tender bids for the realization of HV line 500 kV Boguchanskaya Hydropower Plant–Ozernaya Substation Project, within the frames of development of the United Energy System (UES) of Russia. Alstom to supply traction substations for the Madrid-Levante very high-speed line in SpainДекабря 03, 2010The consortium comprising Alstom, Electren and CYMI signed a 41.3 MEUR contract with ADIF, Spain’s largest railway network administrator, to supply traction substations for a section on the Madrid-Levante very high-speed line. Alstom’s share of this contract represents 13.8 MEUR. Drilling safety verified on GullfaksДекабря 03, 2010A detailed review of planned drilling and well operations has been carried out on Gullfaks since Statoil halted such work on the North Sea field on 10 November. Tokarevka – Mordovo gas pipeline branch construction completedДекабря 03, 2010Stroygazmontazh completed construction/installation works on the “Tokarevka – Mordovo gas pipeline branch” facility. Vega provides increased productionДекабря 03, 20102 December, production commenced on the Vega gas and condensate field off Norway's west coast. This will be an important contribution to Statoil's production on the Norwegian shelf. Gazprom zarubezhneftegaz has completed facilities provision and road reconstruction work in the Shakhrinavsky districtДекабря 03, 2010Gazprom zarubezhneftegaz (the operating company for Gazprom's investment project in hydrocarbon exploration and prospecting in the Republic of Tajikistan) has completed work to provide facilities and reconstruct the access road to the drilling site (the Shakhrinav 1-P well) in the Sarikamysh field in the Shakhrinavsky district of the republic. “Volgogaz” gasified new houses of homeless fire victimsДекабря 03, 2010OJSC “Volgogaz”, being part of “STROYGAZMONTAZH” Group of Companies, has completed construction of gas separation networks in the villages of Verkhnyaya Vereya (Nizhegorodskaya region), Mugreyevskiy (Ivanovskaya region) and Kartanosovo (Ryazanskaya region). |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |