24 Января 2025 | пятница | 17:53
Energoterra

Новости

Rosneft Starts Supplies of High-tech Components for Road Surface of the Formula 1 Race Track at Sochi

Июля 09, 2014

The polymer modified bituminous binder Alfabit, produced by Rosneft was selected as component for the top layer of the asphalt for the fast track Formula 1 Sochi Avtodrom.

E.ON presents Natural Power with ‘Comprehensive Provision of Project Management’ award

Июля 09, 2014

Natural Power joins E.ON at the official opening of their 50 MW Camster Wind Farm after providing key services on the site.

Power Machines to supply equipment for Ust-Ilimskaya HPP

Июля 09, 2014

Power Machines OJSC and Irkutskenergo OJSC have signed a contract to supply four sets of hydro turbine runners, required to renovate Ust-Ilimskaya HPP.

Centrgaz to construct South Stream in Serbia

Июля 09, 2014

In Belgrad (Serbia) South Stream d.o.o. entered into a contract with Centrgaz, which won the bidding for the South Stream gas pipeline construction in the Republic of Serbia.

New excavators arrive at ‘Chernogorski’ open pit

Июля 08, 2014

‘Chernogorsky’ open pit ‘SUEK-Khakasia’ , is pleased to announce the acquisition of two new electro-hydraulic excavators KOMATSU РС-4000 with the bucket capacity of 23 cubic metres.

Bashneft Board of Directors Approves Share Capital Increase

Июля 08, 2014

The Board of Directors of JSOC Bashneft took a decision to increase the Company’s authorized share capital through a public offering of up to 37 million additional ordinary shares.

Elena Burmistrova was appointed Director General of Gazprom Export

Июля 08, 2014

This decision was made due to a considerable increase in the day-to-day business and its geographical expansion, as well as product diversification within the Company’s international activities and, particularly, in Gazprom Export.

Runner for Kamskaya HPP is manufactured by Turboatom

Июля 07, 2014

OJSC "Turboatom" has manufactured an adjustable-blade runner of the fourth hydro turbine (station number 18) for Kamskaya HPP in Russia.

Russia grants ten-year life extension to Kalinin 1

Июля 07, 2014

Rosenergoatom received parent Rosatom's approval of its project to upgrade Kalinin 1 in December 2009.

Projects Progress Was Evaluated in the Donors Conference

Июля 07, 2014

The Assembly noted that for the successful projects implementation it is necessary to make all the efforts to ensure the effective process of necessary documentation submission and review within the authorities.

1 . . . 345 346 347 348 349 350 351 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine