24 Января 2025 | пятница | 17:28
Energoterra

Новости

Rosneft Announcement Regarding Gazprom Position on the Admission of Independent Gas Producers to the Major Gas Pipeline Network

Июля 02, 2014

The head of Gazprom Alexey Miller has announced that “Power of Siberia pipeline and export supplies to China were planned only for Gazprom resource base”.

Turboatom has commissioned a thermal bogie hearth furnace

Июля 02, 2014

In the steam-turbine workshop a thermal gas bogie hearth furnace of Czech company "TahTeh" was commissioned by OJSC "Turboatom".

A turbine is commissioned on Dobrotvorskaya TPP

Июля 02, 2014

After erection and complex pre-commissioning on unit No. of Dobrotvorskaya TPP (Ukraine) a turbine upgraded by "Turboatom" is commissioned.

Ukrtransgaz: Ukraine Taking Solid Steps To Diversify Gas Supplies

Июля 02, 2014

Ukraine is examining the Adriatic Gas Corridor project initiated by Croatia, supported by Hungary and the European Commission.

Turboatom signed a contract to restore hydro turbine shaft for Tashlykskaya PSPP

Июля 02, 2014

According to the agreement, "Turboatom" will machine hydro turbine shaft. Also it is planned to supply spare parts for repairing of wicket gate (station number 2) and carrying out of supervision of the equipment.

South Stream Transport obtains construction permit for South Stream in Russia

Июля 02, 2014

The Ministry of Construction, Housing and Utilities of the Russian Federation granted today a construction permit to South Stream Transport for the South Stream gas pipeline in Russia.

Hydraulic and acid fracturing fleet of Belorusneft returned to Belarus after the completion of work in Samara region

Июля 01, 2014

The project provided for the performance of hydraulic fracturing operations for RITEK JSC at two groups of fields – northern and southern. It implementation started in February of the current year.

MRSK South temporarily dismantled the aerial crossing of the high voltage line 110 kV over the Bakhtemir river

Июля 01, 2014

MRSK South specialists dismantled and then installed a HV line in Ikrianinsky community of the Astrakhan region to ensure passage of the oversized barge “Yury Kuvykin” along the Bakhtemir river.

Belorusneft plannes to drill 5 wells for the exploration of oil deposits at the license areas of Oil Company Yangpur

Июля 01, 2014

This refers to the exploration of the most perspective structures of Izvestinsky license area, Rozhdestvenskaya and Vostochno-Yuzhnaya. This work is planned for 2015 according to the results of technical and economic meeting held in June.

Rosneft started geological exploration in the Barents and Pechora sea

Июля 01, 2014

Seismic work will be performed by a specialized research vessel simultaneously with the shipboard gravi magnetometric survey. All work will be performed in three seismic parties.

1 . . . 347 348 349 350 351 352 353 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine