24 Января 2025 | пятница | 23:28
Energoterra

Новости

Surgutneftegas: In 2013, the investment in the oil refining sector was about RUB 11 billion

Июня 27, 2014

In line with the agenda, the shareholders approved the annual report and annual accounting statements of OJSC “Surgutneftegas”, including the income statement for 2013.

Rosneft and BP Signed a Long-Term Contract for the Delivery of Oil Products on a Pre-Paid Basis

Июня 27, 2014

Rosneft and BP Oil International Limited signed a set of agreements designed to organize long-term deliveries of oil products and oil on a pre-paid basis.

Energy market overview May 2014

Июня 27, 2014

Forward prices of electricity remained stable until mid-May but rose again at the end of the month. Exchange prices of electricity rose significantly in Estonia, Finland, Latvia and Lithuania in May.

LUKOIL holds annual General Shareholders Meeting

Июня 27, 2014

LUKOIL held its Annual General Shareholders Meeting in Moscow to approve the Annual Report of OAO LUKOIL for 2013 and financial statements based on the results of the financial year.

Rusatom International Network and the Faculty of Engineering of the University of Buenos Aires signed a Memorandum of Understanding

Июня 26, 2014

Rusatom International Network JSC and the Faculty of Engineering (FIUBA) of the University of Buenos Aires signed a Memorandum of Understanding.

ROSATOM and Kazatomprom signed a memorandum of understanding and cooperation

Июня 26, 2014

ROSATOM and NAC Kazatomprom signed June 25 in Moscow a Memorandum of Understanding and Cooperation in the field of non-conventional (alternative) energy (solar and wind) and of rare and rare-earth metal production.

Lenenergo has improved power supply to the railroad between Moscow and Saint-Petersburg

Июня 26, 2014

The specialists of Lenenergo JSC (subsidiary of Rosseti JSC) replaced towers and HV lines above the main tracks of the railroad between Moscow and Saint-Petersburg, along the line Sablino-Popovka.

RusHydro selected GlobalElectroService as the general contractor for construction of TPP in Sovetskaya Gavan

Июня 26, 2014

JSC RusHydro announces that JSC GlobalElectroService has won a tender for the construction of 126 MW heat and power unit in Sovetskaya Gavan’ city in the Far East of Russia. E4 Group, JSC Technopromexport and JSC EMK-Engineering also participated in the tender.

FGC UES upgrades the energy infrastructure for 2018 FIFA World Cup

Июня 25, 2014

The Federal Grid Company is now preparing for upgrade and construction of substations and power transmission lines which will be required for the 2018 FIFA World Cup infrastructure.

DTEK exports to Hungary’s internal market

Июня 25, 2014

DTEK Hungary Power Trade LLC has started pilot electricity supplies to the internal wholesale electricity market of Hungary, in line with DTEK's strategy of entering European electricity markets and supplying directly to their consumers.

1 . . . 349 350 351 352 353 354 355 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine