27 Ноября 2024 | среда | 11:42
Energoterra

Новости

JSC FGC UES, Administration of Primorskiy Territory and Hyundai Heavy Industries signed Memorandum of Understanding on construction of electrical equipment plant

Октября 08, 2010

The document was signed by the Chairman of JSC FGC UES Management Board Oleg Budargin, the Governor of Primorskiy Territory Sergey Darkin and the Executive Vice-president of Hyundai Heavy Industries Quon Te Kim.

Leningrad NPP-2: results of September 2010

Октября 08, 2010

In September 2010 construction of evaporative cooling tower No. 1 of Leningrad NPP-2 with the total height of 150 meters was completed. At present the specialists of Metrostroy OJSC contractor organization are carrying out the backfill of cooling tower No. 1.

Gazprom joins Ipati and Aquio projects

Октября 08, 2010

Gazprom Group and French petroleum company Total signed a share assignment agreement within the Bolivia’s Ipati and Aquio blocks exploration project.

Alstom signs Memorandum of Understanding with RusHydro for development of hydropower in Russia

Октября 08, 2010

Alstom Hydro has just signed a Memorandum of Understanding (MoU) with RusHydro, Russia’s largest power generation company, to participate in the development of the Russian hydropower industry.

IDGC of North-West has allocated RUR 695.9 million for electric systems repairing in January-August

Октября 07, 2010

The expenses for implementation of IDGC of North-West’s repair program based on the results of January-August 2010 have equaled RUR 695.9 million.

Smolensk NPP: the target for September has been exceeded by 48 mln kWh

Октября 07, 2010

In September of the current year power units of Smolensk NPP generated 1.463 bln kWh of electric power exceeding the month target by 48 mln kWh. In all the production since the start of the year has amounted to 16.443 bln kWh of electric power.

JSC FGC UES commenced construction of energy facilities to supply power for the second stage of East Siberia – Pacific Ocean pipeline

Октября 07, 2010

JSC FGC UES Branch – Backbone electric grids (MES) of East – has commenced construction of power transmission lines 220 kV Primorskaya GRES – NPS-38 and NPS-38 – Lesozavodsk in Primoskiy Territory.

Novovoronezh NPP: results of work in September

Октября 07, 2010

In September 2010 power units of Novovoronezh NPP generated 702.6 mln kWh of electric power. Thus, the power production plan approved by the Federal Tariff Service of Russia (FTS) was fulfilled by 87.49%.

Vietgazprom is planning to drill a third exploratory well in the Bao Vang deposit

Октября 07, 2010

The Joint Operating Company Vietgazprom is planning to start drilling a third exploratory well (VGP-111-BV-4X) in the Bao Vang deposit this October.

JSC Mobile GTPP and Ener1 signed an Agreement on realization of joint project of grid energy storage

Октября 07, 2010

JSC FGC UES subsidiary – JSC Mobile GTPP and international company Ener1 announced during Sochi Economic Forum about concluding an Agreement on realization of joint project on grid energy storage (GES).

1 . . . 772 773 774 775 776 777 778 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine