18 Декабря 2018 | вторник | 19:17
Energoterra

Новости

“Institute Hydroproject” took part in IV All-Russian meeting of hydro power engineers

Марта 06, 2010

IV All-Russian meeting of hydro power engineers is taking place in Moscow, “Electrification” pavilion of All-Russian Exhibition Center.

Kaluga Turbine Works fulfill order for metallurgic company

Марта 06, 2010

Kaluga Turbine Works (KTZ), a branch of Power Machines, manufactured the first 50 MW steam turbine for Novolipetsk Steel (NLMK).

Gazprom and Perm Krai sign Agreement of Cooperation

Марта 06, 2010

Аt the Gazprom headquarters Alexey Miller, Chairman of the Company’s Management Committee and Oleg Chirkunov, Governor of the Perm Krai signed an Agreement of Cooperation between Gazprom and the Perm Krai for an indefinite period.

Balakovo NPP: more than 2.1 bln. kWh of electric power is generated in February

Марта 06, 2010

In February of 2010 Balakovo NPP in accordance with operations schedule generated more than 2.132 bln. kWh of electric power. Installed capacity utilization factor (ICUF) made 79.34%. The best ICUF value is achieved at power units No. 2 and 3 – 106.9%.

Between 2007 and 2009 Gazprom earmarked in excess of RUB 450 million for the gasification of Karelia

Марта 05, 2010

The Gazprom headquarters hosted today a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Sergey Katanandov, Head of the Republic of Karelia.

Beloyar NPP: plan for February is fulfilled for 104%

Марта 05, 2010

In February of 2010 power unit of Beloyar NPP BN-600 functioned at nominal level of output and generated 401.64 mln. kWh of electric power. The monthly plan for generation is fulfilled for 104.3%. Installed capacity utilization factor in February made 99.61%.

Gazprom would continue investing in gasification of the Republic of Altai

Марта 05, 2010

The average gas penetration level in the region is below 1 per cent. The same rate throughout Russia averages 63.2 per cent. Between 2007 and 2009 Gazprom allocated RUB 1.1 billion for the regional gasification.

"Belkamneft" started 3D seismic works at Pionerskoye oilfield

Марта 05, 2010

"Belkamneft", a subsidiary of OAO NK "RussNeft" started 3D seismic works at Pionerskoye oilfield. The research is being conducted in conformity with license obligations for geological study of subsoil.

Cooperation Agreement Signed between Gazprom Neft and Administration of Nadymskiy District of YaNAO

Марта 04, 2010

Cooperation Agreement 2010 was signed between Gazprom Neft and the Administration of Nadymskiy District of YaNAO.

Discussion of “Karelia Energy Bridge” Russian and Finnish Project at “Karelenergo”

Марта 04, 2010

This summer, a decision on making the application for technical connection to “Karelenergo” electric grids is to be adopted due to results of specified estimation of possibility to create “Karelia Energy Bridge”.

1 . . . 824 825 826 827 828 829 830 . . . 843
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine