27 Февраля 2025 | четверг | 08:18
|
![]() |
Новости![]() Leningrad NPP: power unit No. 3 capacity was decreasedИюля 21, 2010On July 16, 2010, at 7:55 capacity of power unit No. 3 of Leningrad NPP was decreased by 50 % because of disconnection of turbine generator-6 from the power grid. TG-6 was shut down by the plant personnel according to the operating procedure without any deviations. ![]() Rosenergoatom: results of Russian NPPs operation in January–June of 2010Июля 21, 2010In January-June of 2010 operation of nuclear power plants of Rosenergoatom Concern OJSC was safe and reliable. Generation for 6 months of the current years is equal to 83 743.8 mln kWh or 107.8 % of generation for the same period of the previous year. ![]() Director of “Karelenergo” Efim Ashkinezer is an honoured power engineer of Republic of KareliaИюля 21, 2010The honorary title is awarded the Director of branch of IDGC of North-West “Karelenergo” for merits in development of energy industry. ![]() Gazprom reviews Innovative Development Program elaboration issueИюля 21, 2010The Board of Directors reviewed the information on the approaches to working out a draft version of the Gazprom Innovative Development Program until 2020. ![]() RusHydro Signs Trilateral Partnership Agreement with Siemens and Russian TechnologiesИюля 20, 2010JSC RusHydro, together with Siemens and the Russian Technologies State Corporation, have entered into a trilateral partnership agreement calling for strategic cooperation in the manufacturing and sale of industrial products based on renewable energy sources. ![]() “Vologdaenergo” will spend RUR 4,8 mln. for partial reconstruction of 110/35/10 kv substation “Gryazovets”Июля 20, 2010IDGC of North-West’s branch “Vologdaenergo” is reconstructing 110/35/10 kv substation “Gryazovets” as to the installation of two ground-fault neutralizers (GFN) at the 2nd bus sections 10 kv and 35 kv. ![]() TNK-BP Establishes a Council for Interaction with ContractorsИюля 20, 2010To improve the system of relationships with contractors and make the activities of the company more transparent, the management of TNK-BP decided to create a Council for interaction with suppliers and contractors. ![]() Eni starts up offshore gas production from the Tuna field in EgyptИюля 19, 2010The field will produce 4.5 million scm/day of gas which will contribute about 8,500 boe/day to Eni's equity share production. ![]() Rostov nuclear power plant is the winner of the regional stage of the All-Russian contestИюля 19, 2010Rostov NPP has won first place in the regional stage of the All-Russian contest called “Russian Organization of High Social Efficiency" in the "For Human Resources Development” nomination. ![]() Kola NPP: power unit No. 3 is connected to the power gridИюля 19, 2010On July 15, 2010, at 10:50 еurbine generator No. 5 of the third power unit was connected to the power grid. The plant load complies with the dispatch schedule and is equal to 863 mW. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |