25 Ноября 2024 | понедельник | 20:37
Energoterra

Новости

Rostov NPP: scheduled preventive maintenance of power unit No.2 has been implemented

Июля 09, 2010

The scheduled preventive maintenance (SPM) of the equipment of Rostov NPP power unit No.2 was implemented on July 5, 2010. The power unit is connected to Russian united power grid.

TATNEFT: Figures Demonstrating Results of Our Operations in June and from the Beginning of 2010

Июля 09, 2010

Oil companies of the Republic of Tatarstan produced 2,668,419 tons of crude oil in June with six months production amounting to 16,076,691 tons or 100.06% with regard to the same period of the last year.

Kola NPP: power units Nos. 1, 2 and 3 are in operation

Июля 09, 2010

On July 6, at 2:56 p.m. the TG-6 turbo generator of power unit No.3 was shut down by the generator-transformer unit protection. The automatic equipment activated due to the power line cutout in Karelia.

Evraz: Statement in respect of anti-monopoly investigation re coking coal prices

Июля 09, 2010

The Russian Federal Antimonopoly Service (FAS) today announced it had launched an investigation into Evraz Group (LSE: EVR) ("Evraz") and other coal mining companies in relation to the pricing of coking coal in the Russian and export (ex-Russia) markets.

3-D design of nuclear island and power unit will be completed in 2012

Июля 09, 2010

Moscow design and engineering branch — «VVER Design Centre» — was established on the basis of JSC «Atomenergoproekt» as a separate division of the company.

Smolensk NPP: the June plan for power production was fulfilled by 103.6%

Июля 09, 2010

In June, 2010 power units of Smolensk NPP generated 1.443 billion KWh of electric power, the plan was fulfilled by 103.6%. Since the beginning of the year the NPP has produced 11.651 billion KWh of electric power.

Gazprom opens Representative Office in Latvia

Июля 09, 2010

A celebratory opening of Gazprom’s Representative Office in Latvia was held in Riga.

U.S. Plans Cyber Shield for Utilities, Companies

Июля 09, 2010

The control room at a nuclear-power plant in Limerick, Pa. The National Security Agency's 'Perfect Citizen' program will detect cyber assaults on critical infrastructure, but could also help companies in other fields, such as Google, which sustained a major attack late last year.

"Turboatom" is updating unique machine tool station

Июля 08, 2010

OJSC "Turboatom" and German company "Waldrich Coburg" signed the Contract on updating one of the determined machining centers of the plant – spanning - milling machine Waldrich Coburg.

Irkutsk Oil Company has significantly increased oil and condensate production in 1H of 2010

Июля 08, 2010

Irkutsk Oil Company has increased oil and condensate production in 1H of 2010 to 303,000 tons, an 88.7% increase comparative to the same period of the last year.

1 . . . 826 827 828 829 830 831 832 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine