25 Ноября 2024 | понедельник | 22:48
Energoterra

Новости

Invitation for 1H 2010 Investor Conference Call and Webcast

Июля 15, 2010

TNK-BP International Ltd. will host a global investor conference call and webcast to present its 1H 2010 operational and financial results. The call is scheduled for Tuesday 27 July, at 16:00 MSC / 13:00 LDN / 08:00 NY.

"Turboatom": for Kievskaya HPP No 19 (Ukraine) was tested and dispatched runner of hydro turbine

Июля 15, 2010

For Russian concern "Rosenergoatom" (updating of turbine K-500-65/3000) was manufactured and dispatched 4 stages of blades of the 4th stage and four stages of blades of the 5th stage.

“Electrotyazhmash” plans to organize several big service centers in Russia and Kazakhstan

Июля 15, 2010

SE plant “Electrotyazhmash” takes the services on maintenance and repair of supplied equipment to a qualitatively new level and for this purpose will open several own service centers in Russia and Kazakhstan.

Further Analysis to be Carried Out Before Integrity Test Commences on MC252 Well

Июля 14, 2010

Following a meeting with Secretary Chu and his team of scientific and industry experts, the National Incident Commander announced that additional analysis of the well testing procedure should be performed before starting the well integrity test.

Saratov Oil Refinery Declared Region’s Best Exporter

Июля 14, 2010

The Saratov Oil Refinery has been declared winner of the regional heat of the all-Russian Golden Mercury contest in the Best Industrial Exporter category.

Beloyarsk NPP: meeting of Deputy Chief Engineers for operation was held

Июля 14, 2010

At Beloyarsk NPP (Zarechny, Sverdlovsk region) a meeting of Deputy Chief Engineers for operation of Russian NPPs was held.

“Electrtotyazhmash” put into industrial operation equipment for complex machining of collectors

Июля 14, 2010

SE plant “Electrotyazhmash” has put into operation the machine allowing to perform complex machining of collectors.

Automatic protection of Kola NPP came into action because of power line cuts in Karelia

Июля 14, 2010

On July 09, at 10:11 at Kola NPP the TG-2 turbine generator of the first power unit was disconnected from the power grid by activation of emergency control automatics.

Sakhalin Energy Participated in the UN Global Compact Leaders Summit

Июля 14, 2010

How do we go about building a sustainable and ethical global society? How can we better address and manage the risks threatening the planet? What role will business play in responding to these challenges?

Graduates from Top Oil & Gas Institutes Join TNK-BP for Training

Июля 14, 2010

On August 1, 15 graduates from Russia’s biggest oil & gas institutes up to 30 years of age will begin training under a fast-track programme to develop young specialist competences in the field of well servicing and workover.

1 . . . 823 824 825 826 827 828 829 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine