30 Ноября 2024 | суббота | 19:46
Energoterra

Новости

"Turboatom" the beginning of the design of equipment for HPP Gotsatlinskoy

Марта 14, 2011

Specialists of OJSC "Turboatom" transgressed the design of equipment for HPP Gotsatlinskoy, built on the river Avarsk Coys in Dagestan.

EuroSibEnergo and China Yangtze Power announce Siberian project JV

Марта 14, 2011

EuroSibEnergo PLC (“EuroSibEnergo”), the largest Russian independent power company and one of the largest hydro-electric companies in the world, and China Yangtze International (Hong Kong Co., Limited), a wholly-owned subsidiary of China Yangtze Power Co. Ltd., the largest listed hydropower producer in China and one of the top hydropower producers in the world, have announced the formal establishment of a joint venture (“JV”) to develop hydro and thermal power projects in the Siberian part of Russia.

Increase in oil revenue amid unrest in Arab world gives Russia some breathing room

Марта 14, 2011

With the price of oil climbing to more than $100 a barrel, Russia has a little more weight to throw around on the world stage, and it is doing just that. The stepped-up flow of petrodollars into the government's coffers relieves what had been a worrisome budget deficit and lessens the urgency of reform. Good relations with the West - and especially the "reset" with Washington - are not quite so pressing when the economy here is in good shape.

NOVATEK announces consolidated IFRS results for the year ended 31 December 2010

Марта 14, 2011

OAO NOVATEK released its audited consolidated financial statements for the years ended 31 December 2010 and 2009 prepared in accordance with International Financial Reporting Standards (“IFRS”).

Fresh water injected into troubled Fukushima reactor

Марта 13, 2011

Japan's authorities scrambled Sunday to control an overheating reactor of the problem-prone Fukushima No. 1 nuclear power plant, injecting fresh water into it and reducing pressure inside, top government spokesman Yukio Edano said.

Omsk airport unlawfully evaded a fuel-storage contract with “S7” (“Siberia”) Airlines”

Марта 13, 2011

The 9th Arbitration Appeal Court in Moscow upheld the decision of the Federal Antimonopoly Service (FAS Russia) that “Omsk Airport” OJSC violated the Federal Law “On Protection of Competition”.

IAEA update on Japan Earthquake

Марта 13, 2011

Japanese authorities have informed the IAEA that Units 1, 2, and 4 at the Fukushima Daini retain off-site power. Daini Unit 3 is in a safe, cold shutdown, according to Japanese officials.

OJSC "Turboatom" has completed the manufacture of turbine guide vanes for Kremenchug HPP

Марта 12, 2011

Next week in the presence of the customer scheduled functional testing equipment, after which it will be put under the shipment. At Kremenchug HPP “Turboatom” carries out modernization of the existing turbine equipment.

90 per cent of Sakhalin – Khabarovsk – Vladivostok GTS linear part welded up

Марта 12, 2011

A group of the Company's experts led by Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee continues its business trip to the Far East.

Earthquake and Tsunami Update

Марта 12, 2011

The IAEA's Incident and Emergency Centre has received information from Japan's Nuclear and Industrial Safety Agency (NISA) that a heightened state of alert has been declared at Fukushima Daiichi nuclear power plant. NISA says the plant has been shut down and no release of radiation has been detected.

1 . . . 669 670 671 672 673 674 675 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine