26 Ноября 2024 | вторник | 00:48
Energoterra

Новости

Beloyarsk NPP: an emergency response drill was held

Июля 23, 2010

On July 20, 2010, at 16.00, local time, the scheduled emergency response drill with the use of fire-extinguishing equipment was held at Beloyarsk NPP. Heads of departments and fire fighting unit No. 35V took part in the drill.

Preoperational Tests of the Unit № 4 at Sayano-Shushenskaya HPP Began

Июля 23, 2010

On July 22, 2010, the operational tests of the unit № 4 started to be carried out according to the approved program with the continuous control of electric parameters, temperature and vibrating condition of the unit.

Terror Act Occurred at RusHydro's Baskanskaya HPP

Июля 23, 2010

On July, 21th, 2010 at 5:25 a.m. at RusHydro’s Baskanskaya HPP (with installed capacity of 25 MW) an explosion happened. As a result the turbine room was damaged.

Declaration signed between SOCAR and BOTAŞ

Июля 22, 2010

SOCAR and BOTAŞ held talks on the construction of a natural gas pipeline between Turkey and Azerbaijan within the framework of the visit of Turkish delegation headed by Mr. Taner Yildiz, the Minister of Energy and Natural Resources of Turkey to Nakhichevan Autonomous Republic.

Beloyarsk NPP: participation in the exhibition “INNOPROM-2010”

Июля 22, 2010

Beloyarsk NPP took part in the Ural International Exhibition and Forum of Industry and Innovations “INNOPROM-2010” opened in Ekaterinburg. The exhibition was organized by the government of the Russian Federation and Sverdlovsk region.

TNK-BP Increased Investments into Environmental Protection and Industrial Safety Programs in the Saratov Region

Июля 22, 2010

The investments made into environmental protection and industrial safety programs being implemented at the Saratov enterprises of TNK-BP (OJSC Saratov Oil Refinery and OJSC Saratovnefteproduct) in the first six months of 2010 exceeded 265 mln rubles,

Kola NPP: the specialists have appreciated the high level of cooperation with Finland

Июля 22, 2010

А representative of Impact Consulting Oy Ltd, a Finnish consulting company, worked at Kola NPP (Polyarnye Zory, Murmansk region).

Gazprom komplektatsiya and Sukhoi Civil Aircraft Company sign Agreement of Intent for 10 Sukhoi Superjets

Июля 22, 2010

At the Farnborough International Airshow (United Kingdom) Igor Fyodorov, Member of the Gazprom Management Committee, Director General of Gazprom komplektatsiya and Vladimir Prisyazhnyuk, President of Sukhoi Civil Aircraft Company signed the Agreement of Intent for the delivery of 10 Sukhoi Superjet.

LNPP-2: more than 50% of the base plate of power unit No. 2 turbine building has been concreted

Июля 21, 2010

At Leningrad NPP-2 construction site, at the level of minus 6.1 meter the 4-th “pour” of the base plate of power unit No. 2 turbine building has been concreted: 1100 cubic meters of concrete have been laid.

Orenburg Enterprises of TNK-BP Increased Oil Production by 10%

Июля 21, 2010

The oil production of TNK-BP enterprises in Orenburg in H1 2010 exceeded 9.7 mln tons, which is 100.2% of the planned oil production volume and is 9.8% higher than in the same period of 2009.

1 . . . 820 821 822 823 824 825 826 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine